NE High School Basin Sanitary Sewer Project

The NE High School Basin Sanitary Sewer Project will rehabilitate 16,000 lineal feet of aging sanitary sewer pipelines, ranging in size from 6 inch diameter to 18 inch diameter.  The pipes will be rehabilitated with an assortment of techniques including open cut, pipe bursting and cured in place pipe (CIPP) lining.  As part of the design project, plans for repaving of 800 lineal feet of street on NE 18th Street between Hembree and McDonald will be prepared.  The street repaving work will be included in the project construction contract, and will occur after the sanitary sewer rehabilitation work is completed.

 
Schedule:
Field Investigating and Survey  - Complete
Engineering Design   - Complete
Construction   - Project substantially  complete  - final CLOSE OUT IN PROGRESS
uPDATED 2.9.2023